pg网赌软件下载

China Security Co., Ltd
Enterprise News
Zhongke Intelligent, a subsidiary of Zhong'an Technology, participated in the construction and officially opened the Tongjing North Road Tunnel
Release time: 2023-06-26
At 9:38 am on June 26, 2023, the Tongjing North Road Tunnel, which was jointly constructed by Zhongke Intelligent, a subsidiary of Zhong'an Technology, was officially completed and opened to traffic! After the project is opened, it will effectively improve the traffic efficiency of north-south transportation in Gusu District, which is of great significance for improving the road network in Suzhou, improving the traffic efficiency of north-south transportation, and promoting the social and economic development along the line.

The Tongjing Road North Extension Project starts from the south bank of Xitang River and connects to Sucheng Avenue on the north side. To the south, a tunnel is used to pass through Qingtang Road, Shantang River, Shanghai-Ningjing Intercity Railway, existing Beijing Shanghai Railway, and North Ring Expressway. The end point is at the intersection of Xiyuan Road and the current Tongjing North Road. The total length of the route is about 2.067km, and the design speed is 60km/h; The North Extension Project of Tongjing Road adopts a 13.25 meter diameter large cross-section slurry shield tunnel, which is the largest shield tunnel in Suzhou.
In July 2022, Zhongke Intelligent won the bid for the TJL-JK section of the Tongjing Road North Extension Project - Monitoring Project. The project was launched in August 2022, with a construction period of about 11 months.

The Tongjing Road North Extension Project starts from the south bank of Xitang River and connects to Sucheng Avenue on the north side. To the south, a tunnel is used to pass through Qingtang Road, Shantang River, Shanghai-Ningjing Intercity Railway, existing Beijing Shanghai Railway, and North Ring Expressway. The end point is at the intersection of Xiyuan Road and the current Tongjing North Road. The total length of the route is about 2.067km, and the design speed is 60km/h; The North Extension Project of Tongjing Road adopts a 13.25 meter diameter large cross-section slurry shield tunnel, which is the largest shield tunnel in Suzhou.
In July 2022, Zhongke Intelligent won the bid for the TJL-JK section of the Tongjing Road North Extension Project - Monitoring Project. The project was launched in August 2022, with a construction period of about 11 months.
It is reported that our company is mainly responsible for the implementation of monitoring engineering in this project, including the tunnel BAS system
FAS automatic fire alarm system, equipment monitoring system, video monitoring system, etc. At the same time, the tunnel intelligent operation platform developed in this project is based on the concept of digital twinning, and new digital technologies such as the Internet of Things, big data, and artificial intelligence. It has the ability to perceive, monitor, and control equipment for electromechanical equipment, intelligent equipment, fire alarm equipment, data rooms, and other systems, and can freely switch between real and panoramic views, achieving tunnel intensive management. The system is connected to tunnel structural health monitoring equipment, achieving continuous and distributed measurement of strain and temperature information at various locations along the tunnel, sensing the comprehensive temperature and strain response information of the tunnel, and accumulating the strain change trend of the overall structure and key parts during the long-term operation of the tunnel. The system also established a digital base and evaluation model, combined with Al
Algorithms and prediction algorithms can achieve functions such as tunnel disease monitoring, automatic dispatch of work orders, and trend analysis of management and maintenance.
The Tongjing Road North Extension Monitoring Project is another intelligent tunnel project completed by Zhongke Intelligent, a subsidiary of Zhong'an Science and Technology, following the renovation and expansion project of the 312 National Highway Suzhou East Section in the park section and the Dushu Hunan Tunnel. It has made contributions to the transportation and travel of the people of Suzhou.

Scan QR code
Follow the official WeChat platform
Learn more

  • Contact number:027-87827660
  • Company address:Building 5, Huazhong Xiaogui Mountain Financial Culture Park, No. 203, Zisha Road, Wuchang District, Wuhan City, Hubei Province
Copyright 2015-2019 China Security Co., Ltd    | 鄂ICP备2022010799-1号沪公网安备31010702002659号
友情链接: